Skip to product information
1 of 14

feyree V2L Discharge Adapter 110V15A with NEMA5-15 socket for Hyundai Ioniq 5/6, Kia EV6,Kia Niro EVm Genesis GV60,70

feyree V2L Discharge Adapter 110V15A with NEMA5-15 socket for Hyundai Ioniq 5/6, Kia EV6,Kia Niro EVm Genesis GV60,70

Regular price £51.00 GBP
Regular price £0.00 GBP Sale price £51.00 GBP
Sale Sold out
Taxes included.
Plug Type
Quantity

SPECIFICATIONS

Brand Name: feyree

Charger Type: Discharging

Current: 15A max

Height: 6.5

High-concerned chemical: None

Material: Plastic

Origin: Mainland China

Power: 1.65kw

Voltage: 110V

Width: 10

length: 23.5

weight: 0.412KG

【About Adapter】 V2L Adapter converts your EV charger port into a standard AC outlet , so you can use your EV to power your electronic devices, lights,appliances and more. It's perfect for travelling and camping out when you need to use electricity outside.

【Compatibility】Specifically designed for use with the Hyundai Ioniq 5 & 6, and Kia EV6,Kia Niro EV, Genesis GV60,70,Genesis GV80 , FORD F-150 lightning Escape.

【Easy to use】Plug and play, no need any setup operation, very convenient and quick to use.

【Safety Guarantee】In the event of an overload or low load, the adapter will automatically stop working for safe use.

【Compact and portable】It is compact and comes with a storage bag, making it very portable to carry on the go.

Specifications
Compatibility: Type1 J1772
Outlet: NEMA5-15(AC)
Current: AC110V 15AMax
Weight: 0.41kg
 










View full details